Fiberglass Pools

Enjoy Years of Backyard Paradise with Our Fiberglass Pool Installations in Niagara

GemStone is proud to offer professional fiberglass pool installation using high-quality Pentarm Fiberglass Pools. Discover the numerous advantages of choosing fiberglass for your Niagara backyard oasis:

Exceptional Longevity:

Pentarm fiberglass pools are built to last, resisting cracks, fading, and algae growth for decades of enjoyment in the Niagara climate.

Stylish Designs:

Explore a wide range of stunning shapes, sizes, and finishes from Pentarm to perfectly complement your Niagara landscape and personal style.

Effortless Maintenance:

The smooth, non-porous surface of fiberglass makes cleaning a breeze, requiring fewer chemicals and less time spent on upkeep – leaving you more time to relax and enjoy your pool in the Niagara sunshine.

Durability & Strength:

Fiberglass pools are incredibly strong and resilient, able to withstand the freeze-thaw cycles common in the Niagara Region without the need for costly repairs.

Quick Installation:

Compared to traditional concrete pools, fiberglass pools can be installed much faster, minimizing disruption to your Niagara property and getting you swimming sooner.

What to expect when getting a fiberglass pool installed

Phase 1: Consultation and Planning

  1. Initial Consultation: Meeting with the homeowner to discuss their needs, preferences, budget, and backyard layout.
  2. Site Evaluation: Assessing the property, including access, slope, soil conditions, and proximity to utilities.
  3. Pool Selection: Helping the client choose the ideal Pentarm fiberglass pool model that fits their lifestyle and property.
  4. Permitting: Assisting the homeowner with obtaining the necessary permits from the City or township. This includes submitting site plans and ensuring compliance with local zoning and building codes.
  5. Detailed Planning: Creating a comprehensive installation plan, outlining timelines, equipment needs, and any specific considerations for our site.

Phase 2: Site Preparation

  1. Utility Marking: Ensuring all underground utilities (gas, electrical, water, cable) are clearly marked to prevent damage during excavation.
  2. Excavation: Carefully excavating the pool area according to the pool’s dimensions and the installation plan, taking into account proper clearances and depth.
  3. Grading and Leveling: Precisely grading and leveling the bottom of the excavation to create a stable and even base for the pool shell.
  4. Base Material Installation: Laying a suitable base material in the excavation to provide a solid foundation for the pool.

Phase 3: Pool Installation

  1. Delivery and Placement: Carefully delivering the Pentairm fiberglass pool shell to the site and using appropriate equipment (crane or excavator) to gently lower it into the prepared excavation.
  2. Leveling and Alignment: Ensuring the pool shell is perfectly level and correctly aligned within the excavation. Precise leveling is crucial for proper water circulation and aesthetics.
  3. Plumbing Connections: Connecting the necessary plumbing lines for the filtration system (skimmer, main drain, returns), as well as any other features like water features or future automation.

Phase 4: Backfilling and Equipment Installation

  1. Backfilling: Carefully backfilling the space around the pool shell with appropriate materials in stages, while simultaneously filling the pool with water to equalize pressure and prevent damage to the shell. This process requires careful attention to avoid voids and ensure proper support.
  2. Equipment Pad Preparation: Creating a level and stable pad for the pool equipment (pump, filter, heater, etc.).
  3. Equipment Installation: Installing the chosen Pentair or other quality pool equipment on the prepared pad and connecting the plumbing and electrical components.

Phase 5: Decking and Finishing

  1. Coping Installation: Installing the coping (the edge around the pool) using appropriate materials that complement the pool and decking choice.
  2. Decking Installation: Installing the chosen decking material (pavers, concrete, stone, wood, composite) around the pool, ensuring proper drainage and a safe surface.
  3. Electrical Hookups (Final): Completing all final electrical connections for lighting, automation, and other features by a licensed electrician, adhering to local codes.

Phase 6: Final Steps and Handover

  1. Final Grading and Landscaping: Completing any necessary final grading of the surrounding area and preparing for landscaping.
  2. Initial Chemical Balancing: Testing and balancing the pool water chemistry to ensure it’s safe for swimming.
  3. Equipment Start-Up and Testing: Thoroughly testing all pool equipment, including pumps, filters, heaters, automation systems, and covers, to ensure proper operation.
  4. Homeowner Orientation: Providing the homeowner with detailed instructions on pool operation, maintenance, water chemistry, safety guidelines, and warranty information specific to their Pentarm Pools and installed equipment.
  5. Clean-up and Site Restoration: Ensuring the entire work area is clean and free of debris.

Throughout the entire process, communication with the homeowner is key to ensure their satisfaction and address any questions or concerns. Adherence to local building codes and best practices is also paramount.